1
Use the mouse wheel to zoom, click to drag/move
Use the mouse wheel to scroll, click to zoom
Click to expand image full screen
NMT 4
Oswald Pohl (Chief of WVHA (SS Econ. and Admin. Main Office); Lt. General Waffen SS)
Date: 29 July 1944
Literal Title: Re: Allocation of SS-Construction Brigades 1 and 5 for Fortifications and Supply Depots for V 1 and V 2.
Defendant: Oswald Pohl
Total Pages: 1
Language of Text: English
Evidence Code: NO-2611
Exhibit Code: Prosecution 366
Document Book No: Prosecution 13
Citation: NMT 4 (page 648)
HLSL Item No.: 4277
Notes:The report is document NO 2615 (database item 4278). The trial transcript mis-states the document number as NO 2622; 2611 is correct.
NO-2611: Cover letter to a report by SS-Gruf. Dr. in Hans Kammler, sent by SS-Ogruf. Oswald Pohl, Chief of WVHA; to RF SS on construction of V 1 and V 2 sites and dumps
NO-2611: Report on use of construction brigade under Amtsgruppe C on V1 and V2 sites
29 July 44 - Pohl to Himmler enclosing a report of Kammler re construction of V1 and V2 sites.
Use the mouse wheel to zoom, click to drag/move
Use the mouse wheel to scroll, click to zoom
Click to expand image full screen